January 3: UBCH power shutdown scheduled
In order to service and upgrade our vital electrical equipment, a power shutdown is scheduled for Koerner Pavilion at UBC Hospital. Emergency power (i.e. red outlets) will be available. Details as follows:
When: Friday, January 3, 2013 from 2200 to 0800 hrs
Where: Koerner Pavilion only; Purdy and Detwiller Pavilions (Kinsmen Tower) will be unaffected
For more information
To learn more about the shutdown and how you can prepare:
- Refer to the attached UBCH Electrical Shutdown Bulletin
- Speak with your manager/supervisor before submitting an online maintenance request

